Tuesday, September 21, 2010

Twin Drive

I went ahead and mounted the second Gear Drive system.
I have some work to do to this shoulder, But I wanted to see how they
would look inside the droid.

Monday, September 20, 2010

More 2-3-2

The drive system is bolted in the frame now.
I had a hard time figuring out how to bolt all the parts and being able to get to
the screws.
I drilled a 1/2 inch hole just above the main shaft on the gear and the way I bolt everything is:
Bolt the bearing to the frame, Through the 1/2 inch hole screw the body to shoulder hub
to the outer flange of the bearing.
Then mount the drive system into the frame.
I'll show pictures next time.
Now the only thing I need is the drive motor. getting the right size, speed and strength will be the hardest part.

Saturday, September 18, 2010

Shoulder Work

I cut a body to leg circle today and I routed into it to mount a aluminum
plate. The plate will act as a gear so the D shaft from the gear box will
have something to lock and turn the legs.

You can see the bearing bolts to the circle and the aluminum plate is under it.
The shoulder looks off right now because I need to sand it with my drum sander to true the circle.
It really is not that far out of round it's just the camera makes it look bad.
The bottom picture shows the gear box inside the frame. It's not bolted yet,
It's just for the picture.







2-3-2 Motor

I got this motor setup out of a brand new Linear Garage Door Opener.
The opener is rated at 1/2 Hp and can lift up to a 18 foot x 7 foot garage door.
It's more than enough to move the legs.
It already has limit switches built into the drive system.
All I need is to locate another one for the other outer leg.




Wednesday, February 3, 2010

Bearing Update



I had to order some new bearings for the shoulders.
The one's I had were 6 inch which was fine, But they would not leave enough
room at the skins for the legs to be removed easily.
So, I ordered some 4 inch bearings and they fit perfect.
Actually I may have stumbled onto something Dave E. had already thought about.
In his plans the shoulder area has 4 drilled holes that do not come into play.
Unless you are adding this same bearing. The holes are a perfect fit.

Sunday, January 17, 2010

General Update


Here's where we all stand as far as the new Droid builds.

Outer Skins




After the inner skins have dried and sanded, The outer skins are next.
Here again I had to let Brenda do the gluing since I can't see it run.
The back door is also being taped and glued into place.
I didn't go into much detail about this process because Dave's plans
already tell much about the process.

Tuesday, January 12, 2010

Skin Bonding





I found out that I can't glue :o(
Brenda had to do all the gluing because I can't see the drip that runs down the frame. She's got the glue down pat. It's such a small amount that it's almost like
not even using any at all.
But here's the body after a good sand with 220 grit paper.
I don't know if Dave E. sands his droids, But I like how it smooths every spot out.
Next will be adding the outer layer of skins and more sanding.

Wednesday, January 6, 2010

Inner Skins






After building your frame, It's time to lay on that 1st layer of skins.
You tape the front and back skin to the frame and adjust it the best you can so
all the doors and pockets line up.
You may have some spots that just don't set edge to edge and it may be a off spot
in the frame. I tried my best to get everything perfect, But I do have some bad spots.
Once your satisfied with the fit, You glue the skin to the frame from the inside.
I learned that when you use Weldon Glue, Use it very lightly.
Just a rolling drip down each frame rail that touches the skin is enough.
If you use to much glue it will melt and warp the skin. I would practice on some
scraps before you glue the real thing.

Frame Mod


The pictures show where I have been adding supports to the side area of the frame
and top the back of the frame. Do you need this in a Dave E. Frame? No.
I'm adding these because I wanted the frame extra ridged to with stand the torque
from going from 2 legs to 3 legs.
I will add some more supports to the front of the frame once I get the skins mounted.
Adding the supports sure made the frame much stronger, But it will make it a little
harder to get the glue to the inner skin.


Thursday, December 17, 2009

Extra support for Shoulders



If your not doing the 2-3-2 movement you won't need this area beefed up.
I'm adding extra to this area and I'm also going to add 2 more shoulder plates
to the inside of Dave's shoulder plate which will make this area 3/8 thick
for the outer leg bearings to mount.
I just figure the movement will add stress to this area and it needs to be strong.

Monday, December 14, 2009



I started fitting the bearing into the outer leg.
What I had to do was cut a new size sideplate that Dave E. uses in his build.
The plate had to be mount 3/8 further into the leg opening to make up the
difference that the bearing used.
The bearing has more than enough turning radius and has very little play.
I used Dave's blueprint to center the bearing and you can see the drilled
holes that Dave marks on the blueprints.
I have 2 drive system in mind and hopefully one of them will work.
I guess I should warn everyone not to try this until I get it all worked out.

Thursday, December 10, 2009

Leg Bearings



I bought 2 of these 6 inch bearings from Rockler, I will use these for the outer legs on R5. Since the legs won't have to move a great distance to do the 2-3-2 and the bearing weight rating is more than enough for a styrene droid, I'm sure they will work.
I will have to trim the square at the points to fit in the droid.
The good part about this bearing is it's only 1/4 inch thick which will be easy
to modify the frame to accept the bearing.

Sunday, December 6, 2009

2nd Bottom Plate



This is the 2nd bottom plate that gets glued to the bottom of the frame.
This makes the bottom 1/4 inch thick and much stronger.
I used 3 screws in the center to help me align the plates together.
The only thing is if I had to do this again, I think I would have just used a
1/4 inch thick plate instead of laminating the 2- 1/8 inch plates together.
I'm sure Dave does this to eliminate the need for additional styrene.

Friday, November 27, 2009

Top Plate and Shoulder Plates






The top plate has holes marked that you will need to drill for the dome bearing
and the motor mount in the rear of the droid.
Lay the top plate down with the scribed marks facing up and set the frame on
top then glue all the top verticals in place.
After this is done and dried, You can glue in the Shoulder Plates in the sides.
The shoulder plates are for the outer legs to attach.

Top Rear Verticals





We glued the top rear verticals in place and it's the same process as
the others.
Once these dry, We can glue the top ring into place.

Thursday, November 26, 2009

Front Vent Area







This area was alittle bit more tricky than the others.
Dave E. say's to pay close attention to this area and make sure you get the alignment
very accurate or the frame will try and twist.
I'm pretty positive that we got it right, But I won't know until I move on
with the build.

3rd Ring & Front Door Vertical







In the pictures from bottom to top, You can see the blueprint on the 3rd ring
and where you will need to scribe and cut the ring.
The next picture shows the ring after the cuts have been made and this leaves
you with 3 usable parts. The ring we are using now is the large ring for the rear of the droid.
Here again you work your way around the ring making sure everything lines up.
We also glued 2 Door Verticals at the front part of the ring.
These add support for the 2 large doors on the droid and you can see it also
adds support for the next ring plate.

2nd Set of Verticals






Now we start gluing the next set of vertical plates on top of the 2nd ring.
There are 8 verticals and like the 1st set, Take your time and glue them
around the backside of the droid frame.
Make sure again to check them for square and flush the outer edge with the
2nd ring.

Tuesday, November 24, 2009

Baseplate Ankle Insets & 2nd Plate




On the bottom picture, You can see the Ankle Insets being glued into place.
This area provides a clearing for the outer legs to pass the body if your
building your droid to stand on 2 feet and then move to the 3 leg position.
This movement is known as the 2-3-2.

The next picture shows the 2nd ring being glued into position.
There's 10 spots that have to be glued and the way I did this one
is to lay the plate on top of the verticals and align the plate as
best as you can with the scribed marks facing up.
Glue 1 vertical then after it dries glue another vertical across
from the one you just glued. Make sure you pay close attention to all
the scribes as you work around the plate.
I left the Ankle Inserts as the last parts that get glued after the
other eight.
I also used the Weldon can as a weight to keep the verticals in place as I glued
them.