Thursday, December 10, 2009

Leg Bearings



I bought 2 of these 6 inch bearings from Rockler, I will use these for the outer legs on R5. Since the legs won't have to move a great distance to do the 2-3-2 and the bearing weight rating is more than enough for a styrene droid, I'm sure they will work.
I will have to trim the square at the points to fit in the droid.
The good part about this bearing is it's only 1/4 inch thick which will be easy
to modify the frame to accept the bearing.

Sunday, December 6, 2009

2nd Bottom Plate



This is the 2nd bottom plate that gets glued to the bottom of the frame.
This makes the bottom 1/4 inch thick and much stronger.
I used 3 screws in the center to help me align the plates together.
The only thing is if I had to do this again, I think I would have just used a
1/4 inch thick plate instead of laminating the 2- 1/8 inch plates together.
I'm sure Dave does this to eliminate the need for additional styrene.

Friday, November 27, 2009

Top Plate and Shoulder Plates






The top plate has holes marked that you will need to drill for the dome bearing
and the motor mount in the rear of the droid.
Lay the top plate down with the scribed marks facing up and set the frame on
top then glue all the top verticals in place.
After this is done and dried, You can glue in the Shoulder Plates in the sides.
The shoulder plates are for the outer legs to attach.

Top Rear Verticals





We glued the top rear verticals in place and it's the same process as
the others.
Once these dry, We can glue the top ring into place.

Thursday, November 26, 2009

Front Vent Area







This area was alittle bit more tricky than the others.
Dave E. say's to pay close attention to this area and make sure you get the alignment
very accurate or the frame will try and twist.
I'm pretty positive that we got it right, But I won't know until I move on
with the build.

3rd Ring & Front Door Vertical







In the pictures from bottom to top, You can see the blueprint on the 3rd ring
and where you will need to scribe and cut the ring.
The next picture shows the ring after the cuts have been made and this leaves
you with 3 usable parts. The ring we are using now is the large ring for the rear of the droid.
Here again you work your way around the ring making sure everything lines up.
We also glued 2 Door Verticals at the front part of the ring.
These add support for the 2 large doors on the droid and you can see it also
adds support for the next ring plate.

2nd Set of Verticals






Now we start gluing the next set of vertical plates on top of the 2nd ring.
There are 8 verticals and like the 1st set, Take your time and glue them
around the backside of the droid frame.
Make sure again to check them for square and flush the outer edge with the
2nd ring.